Dumps4cert.com : Latest Dumps with PDF and VCE Files
2018 Jan Oracle Official New Released 1z0-565
100% Free Download! 100% Pass Guaranteed!
http://www.Dumps4cert.com/1z0-565.html

JD Edwards (JDE) EnterpriseOne 9 Manufacturing Essentials

Question No: 31

Identify how the Actual Variance is calculated;

  1. Difference between Standard Amount and Current Amount

  2. Difference between Current Amount and Planned Amount

  3. Difference between Planned Amount and Actual Amount

  4. Difference between Actual Amount and Completed Amount

Answer: C

Question No: 32

Identify three codes that designate elements of cost for an item.

  1. B4; Labor Efficiency

  2. OO; Outside Operation

  3. A1: Material

  4. B1: Direct Labor

  5. IO: Inside Operations

Answer: B,C,E

Question No: 33

Which two statements are true about Bills of Material?

  1. The E type Bill of Material Is used for prototype cost roll ups.

  2. MRP does not plan for Percent of Scrap.

  3. Percent of Scrap Is a factor in the A2 cost calculation of the parent Item.

  4. The cost Simu-lation program uses the amount in the Bill of Material Unit Cost field for developing costs.

  5. The M type Bill of Material is the default used In the simulated cost roll up.

Answer: C,D

Question No: 34

Lots can be generated automatically when any of these three tasks are performed.

  1. Create a Purchase Order

  2. Create a Work Order

  3. Complete a Work Order

  4. Complete Purchase Order Receipts

  5. Adjust Inventory

Answer: B,D,E

Question No: 35

Which are valid Order Policy Codes?

  1. Reorder Point

  2. Fixed Order Quantity

  3. Maximum Order Quantity

  4. Minimum Order Quantity

  5. Economic Order Quantity

Answer: D

Question No: 36

The project planning phase, which begins after the customer accepts the quote, consists of which three of these options?

  1. Refine the project scope

  2. Project schedule

  3. Complete the scheduled project tasks

  4. Actual costing

  5. Requirement plan

Answer: A,D,E

Question No: 37

Which three statements are true about the Manufacturing Work Center?

  1. Defines work center labor, machine, and set up rates.

  2. Each Work Center has a maximum of eight available shifts.

  3. Specifies the Work Center Efficiency for Product Costing.

  4. A Work Center is a business unit with a Business Unit Type of FMG.

  5. It can be part of a dispatch group for departments that perform similar operations

Answer: B,C,D

Question No: 38

The system deducts materials from inventory when you report items on the work order or rate

schedule as complete. What is this method of Inventory Issue?

  1. Manual Issue (P4112)

  2. Preflush

  3. Backflush

  4. Super Backflush

  5. Manual Issue (P31113)

Answer: C

Question No: 39

Identify how the planned variance is calculated:

  1. Difference between Standard Amount and Current Amount

  2. Difference between Current Amount and planned Amount

  3. Difference between Planned Amount and Actual Amount

  4. Difference between Actual Amount and Completed Amount

Answer: C

Question No: 40

Which two are features of the Forecast Management system?

  1. The ability to create forecasts while entering Sales Orders

  2. The ability to enter forecasts manually

  3. The ability to create forecasts through MRP Messages Processing

  4. The ability to summarize sales order history in weekly or monthly time periods

  5. The ability to select from 10 formulas

Answer: B,E

100% Dumps4cert Free Download!
Download Free Demo:1z0-565 Demo PDF
100% Dumps4cert Free Guaranteed!
1z0-565 Dumps

Dumps4cert ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.